STARLab
ACCESS

ACCESS

About the Project
ACCESS Blimp

The ACCESS (Arctic Community Connectivity for Equity, Sustainability, and Service) project is an interdisciplinary initiative focused on improving communication, safety, and connectivity in remote northern communities. Arctic communities face mounting pressures from climate change, which has altered seasonal travel routes and created more frequent and extreme weather events — increasing the need for reliable connectivity for safety and situational awareness on the land. Bringing together expertise from Engineering, Remote Sensing, Social Work, and Medical Services, ACCESS is developing an innovative airship platform designed to operate in these demanding Arctic environments. Beyond technology, the project is rooted in strong community partnerships, working directly with the community of Chesterfield Inlet, NU to understand their needs and co-develop solutions that enhance emergency response, support everyday activities on the land, and promote long-term resilience. By combining technical innovation with community-informed design, ACCESS aims to create practical, reliable systems that strengthen connectivity while supporting Indigenous self-determination.

Inter-disciplinary Teams

Engineering

The engineering team focuses on translating community-identified needs into a feasible airship concept, with particular emphasis on operational practicality in Arctic conditions. This role includes observing on-the-land travel with hunters and response teams, identifying environmental and logistical constraints, and shaping the design accordingly. Rather than emphasizing technical subsystems, the team prioritizes how the airship can support communication, safety, and reliability based on lived experiences in the field.

Social Work

The social work team leads community engagement and ensures that the research process is grounded in ethical, inclusive, and culturally appropriate practices. Their role includes facilitating interviews and focus group, as well as incorporating perspectives from women, families, and other community members whose voices are often underrepresented. This role also guides the application of building and promoting Indigenous self-determination throughout the project.

Medical Services

The medical services team examines how hand-held cognitive devices can enhance emergency response and healthcare access in remote environments. Their role includes identifying challenges faced during medical emergencies on the land and exploring how the airship concept could support communication between travellers and healthcare providers. They also provide insight into response timelines, safety considerations, and practical needs that inform how the system can better support community well-being.

Remote Sensing

The remote sensing team focuses on understanding how data collected from aerial platforms can support community needs, particularly in monitoring environmental conditions and improving situational awareness. Their role involves identifying relevant sensing capabilities that could enhance safety on the land, such as observing terrain, ice conditions, or wildlife presence. They also consider how such data can be meaningfully interpreted and shared to support decision-making in a way that aligns with community priorities.

Chesterfield Inlet, Nunavut

Chesterfield Inlet is a small, remote Arctic community located along the western shore of Hudson Bay in northern Canada. Characterized by its harsh climate, vast tundra landscape, and rich Indigenous heritage, it presents both unique challenges and opportunities for research. The ACCESS project is being co-developed with this community, where researchers aim to collaboratively explore sustainable technologies to improve connectivity. Through active engagement and long-term relationship building, the initiative seeks to support community-driven solutions that foster self-determination and strengthen local governance.

STARLab is committed to co-developed research with Indigenous communities. We respect their traditional knowledge, sovereignty, autonomy, and traditions while working collaboratively to maintain and improve security and prosperity.

High Level Overview

Blimp Design
Phase 1 (Preliminary)

The design of the airship centers on achieving stable altitude through a combination of passive buoyancy and controlled actuation. The ballonet system is used to regulate internal air volume, allowing the airship to reach and maintain near-neutral buoyancy at a target altitude with minimal energy consumption. Once this equilibrium is achieved, onboard propellers are primarily used for stationary keeping, providing fine adjustments to maintain position and attitude against wind disturbances. Beyond control, key design considerations include identifying an optimal operating altitude that balances community communication needs, regulatory compliance with air traffic control, and environmental factors such as wind and weather variability. The system must also incorporate practical deployment elements, including ground mooring for safe handling during launch and recovery, and the use of helium as a lifting gas to ensure operational safety and reliability.

The first prototype model was developed as a simple experimental platform to validate the concept of using a ballonet for passive buoyancy control. In this setup, the outer envelope, made of Mylar to prevent stretch and unwanted expansion, was fully inflated and its baseline weight recorded, after which the internal ballonet, made of latex, was incrementally filled with air and the corresponding change in system weight was measured. This approach allowed for a direct assessment of how introducing air into the ballonet increases the overall mass of the system, effectively acting as a dynamic ballast. In addition, this model was used to design and test a preliminary connector interface between the envelope and the ballonet, ensuring an airtight connection and minimizing leakage. The results from this prototype provides a feasibility analysis of using a ballonet to modulate buoyancy without altering the lifting gas, demonstrating its potential as a practical mechanism for achieving controlled ascent, descent, and stable altitude in the airship design.

Phase 2 (Critical Design)

Detailed CAD modelling is now carried out to develop a manufacturable airship design, while parallel Matlab/Simulink models were built to guide sizing decisions. These simulations informed the selection of a hull volume of 16.4 m³ and a ballonet volume of 0.28 m³, ensuring sufficient lift capacity while accommodating the full suite of control system components.

Full-size Blimp

Gondola

 The design also evolved to include clearly defined integration features: designated mounting locations for stationary-keeping motors, transparent window sections to allow internal inspection of the envelope and ballonet, and structural attachment points on the top of the hull for payloads such as communication systems (e.g., Starlink). On the underside, provisions were incorporated for gondola mounting, balance pockets for fine mass distribution, and additional interfaces to support modular expansion.

This section outlines the safety procedures for filling a blimp envelope with helium gas in an indoor setting [Atrium]. The goal is to ensure safe handling of compressed gas cylinders and avoid hazards related to pressure, asphyxiation, or accidental leaks.

Overview:

  • Gas Type: Helium (inert, non-flammable)
  • Envelope Volume: 16.4m³
  • Final Pressure: 1 atm (at sea level equivalent)
  • Environment: Atrium
  • Filling Equipment: Helium cylinder with pressure regulator, flexible hose with clamp, flow control valve
  • Estimated Gas Requirement: Approximately 16.4m³ of helium at standard temperature and pressure (STP)

Pre-filling Safety Procedure:

  • Do not step on the blimp
  • All involved personnel must wear appropriate PPE.
  • Prior to filling the blimp with helium, attach the tether line to the blimp
  • Harness and tie off the other end of the tether line to the suggested secure location in the Atrium.
  • The tether lines can be attached to the blimp via 6x M3 screws. Screw the M3’s onto the mounting points located on the envelope.
  • Make sure the tether line does not come into contact with any sharp objects, as this may result in the tether line being severed and the blimp escaping.
  • Check knots in harness prior to filling blimp with helium
  • Inspect hoses and clamps for damage or signs of wear.
  • Confirm all ignition sources are removed (even though helium is inert).

NOTE [Helium expands when exposed to warm conditions]:

Decrease in temperature may cause the blimp to sag and reduce lift capacity; increase in temperature will increase tautness with the possibility of rapture. Do not inflate the blimp taut. After inflation one should be able to push your hand 3 to 4 inches into the body of the blimp. If the blimp is flown in cold temperatures during the day and then store the blimp in warmer conditions indoors at night, it is a must to release some helium, as the warmer conditions will cause the blimp to expand. If this safety procedure is not done, there is a possibility of rapture or leaking; hence, to resolve this the blimp has a safety release valve which actuates to vent the helium gas when a pressure threshold of 42MPa is sensed within the internal pressure of the blimp, with the actual burst pressure of 47 MPa there is a factor of safety of 1.12. So in case the atrium has large variable temperature changes, the safety valve protects the blimp from potentially bursting.

Filling Procedure:

  • Ensure flexible hose is securely fastened onto the scoprega valve on the blimp and the other end is connected to the output of the pressure regulator valve.
  • Ensure the input of the regulator valve is attached to the pressurized helium tank via the flexible hose.
  • Use the tether line to secure the blimp in place.
  • Open the pressurized helium tank valve.
  • Regulate the knob on the pressure regulator to reduce the high pressure (high pressure value based on pressurized cylinder purchased)
  • Inflate the blimp up to 80 to 90% – not full capacity! This is to let the gas accommodate to the external (Atrium) temperature.
  • Install the gondola on the bottom of the airship.
  • At this point the remaining helium can be added to full capacity. A sign of a good inflation is when the middle of the airship is firm (taut) and there are some wrinkles on the joints (where stationary keeping motors are located)
  • After inflation procedures are completed the airship has to be balanced with the use of the balance pockets. To orient its center of mass to ensure the airship is upright facing (such as what is shown in the CAD model).

Post – Filling:

  • Close all gas valves and ensure the helium cylinder is properly stored.
  • Label the filled envelope with date/time and pressure reading.
  • Store the blimp away from heat sources and sharp objects.
  • Record all observations in the safety logbook.

For testing the flight controls of the spherical airship which is 3.15m in diameter there will have to be a space of at least 20m in height and 15m in width to ensure there is enough room to move the airship for both altitude and stationary keeping control. The figure shows the measured width (19 m) and height (23 m) of the engineering atrium.

Atrium dimensions
Blimp in atrium

Five tether lines are anchored to structurally secure points around the atrium, including elevated fixtures and railing interfaces, to constrain the blimp’s motion while allowing limited positional adjustment. A ceiling-mounted pulley system enables controlled deployment and retrieval, making it easier to adjust the distance of the blimp to the ground during testing without direct handling. Importantly, all tether attachment points were deliberately selected to be inaccessible to the public, reducing the risk of interference or accidental contact. The tether lines are connected to reinforced mounting points on the airship using M5 screw interfaces, ensuring reliable load transfer while maintaining the integrity of the envelope. This setup creates a controlled indoor test environment where the airship can be safely be operational without compromising safety or structural performance.





Phase 3 (Build)

This phase translates the detailed designs from Phase 2 into a manufacturable airship system. Following the critical design stage, where CAD models were developed to meet flight control and structural requirements, fabrication required specialized processes beyond in-house capability. In particular, constructing the envelope involved precision joining of multiple gores to form the spherical hull, which necessitates ultrasonic welding techniques for strength and leak prevention. To achieve this, we partnered with Aerodrum, a manufacturer with expertise in airship fabrication. The finalized CAD models were provided to guide production, ensuring that the envelope geometry and internal volume matched the design specifications. In addition to fabricating the hull, Aerodrum integrated key structural features including reinforced mounting points for tethering and gondola attachment, as well as balance pockets for mass trimming and provisions for lead ballast bars. This phase ensured that the physical airship accurately reflected the design intent and was ready for subsequent testing and integration of control systems.

Gondola

The gondola serves as the central subsystem platform of the airship, functioning as a modular housing unit for all onboard control and support components. In this prototype, its primary role is to integrate and secure the flight control system, including the autopilot (Cube Orange Plus), power distribution, batteries, telemetry modules, sensors, and propulsion interfaces. The gondola provides a stable and accessible structure for wiring, component layout, and system testing, enabling efficient development and tuning of the altitude and station-keeping control strategies. Designed with scalability in mind, the gondola can be further upgraded to accommodate additional payloads once stable flight control is achieved, such as remote sensing instruments, communication systems, or environmental monitoring devices. This flexibility ensures that the platform can evolve from a control-focused prototype into a more mission-capable system aligned with community needs.

Laser Cutting black acrylic plate (3mm thickness) for Gondola structure.

Ballonet Pressure Calibration and reading test.

Airborne Connectivity

The ACCESS airship is being integrated with a Starlink Mini satellite dish mounted on top of the hull for unobstructed sky-facing reception, while a Starlink router is housed on the underside of the gondola below. This configuration allows the dish to maintain a clear line of sight to the satellite constellation above while the router below distributes connectivity to users on the ground. By hovering at altitude over remote Arctic terrain, the airship transforms into a mobile broadband relay — extending internet coverage to hunters, search-and-rescue teams, and community members operating far beyond existing infrastructure, precisely when reliable communication matters most.

Before indoor tests begin, a drone was set-up in the engineering atrium to mimic the blimp. The goal was to understand the ideal flying area for the blimp inside the atrium since the Vicon motion camera have a field of view we have to constrain the blimp to in order to get flight data from the blimp. Flying the drone allowed us to capture the maximum distance in all three axis so its in view of the Vicon camera during the test.

Objective

  • To test the Vicon motion capture cameras in the EITC Atrium to collect flight data from a drone using the VICON tracker and MATLAB.

Equipment

  • Vicon cameras mounted and calibrated
  • Drone fitted with reflective markers.
  • Ground Station laptop running the Vicon tracker and MATLAB with DataStream SDK.

Figure 1- Test Setup in the Atrium

Procedure

1. Set up the computer and the wiring for the cameras.

2. Place the cameras in positions such that it covers a decently large area and calibrate them using the tracker app.

3. Stick the reflective markers on the drone and make sure that the markers are visible in the VICON Tracker software (shown as white dots in the Tracker).

4. Run flight sequences involving hovers, straight lines and figure-8’s.

5. Record these trials in the VICON Tracker software.

6. The trials in the tracker app are run simultaneously alongside the MATLAB code through the VICON DataStream SDK to obtain plots for translational and rotational data.

7. The setup will be removed and packed up from the atrium after enough trials are completed.

Figure 3-VICON Tracker showing the markers on the drone

 

Results

  • The MATLAB Software initially runs a live graph alongside the recording of the drone trial.
  • Once the live figure is closed, the code outputs multiple graphs including position, linear and angular velocity, 3D trajectories etc., of the drone during that trial.

Figure 5-Live Motion Tracking Plots

Figure 6-Centroid Linear Velocity of the object

Figure 7-Centroid Angular Velocity Plot of the object

Figure 8-3D Trajectory of the object

Vicon Camera Calibration Process
Vicon motion camera field of view demonstration test

Canadian Aeronautics and Space Institute (CASI) 2026 - RBC Convention Center [Oct 14-16 ]

PSO-Based Multi-Objective Layout Optimization For Diverse Airship Hull Geometries with Reduced Energy Demand

- Mana Zandvakili

A Ballonet-Based Momentum Management Architecture For Airship Altitude

- Daniel Asante

Indoor Flight Control Tests

Blimp Set-up Mount

The blimp is suspended in the atrium from a pulley system on the ceiling structure of the University of Manitoba’s engineering atrium. A helium storage tank is not available, so the blimp stays up between tests. This lets us reuse the same gas across many test sessions rather than venting it after each one. The tether  points are placed out of public reach, so people using the atrium can’t touch or disturb the setup. The blimp can sit in position between tests while we keep working on the gondola and other mechanical tasks. 

Tethered Blimp flying

Blimp Storage in Atrium after flight tests

Outdoor Blimp Bench Testing (GPS) - Autonomous Control

Our follow-me system depends on GPS, which doesn’t work reliably indoors, so we moved the airship’s electronics to an outdoor bench for testing. The idea is a leader–follower pair. A small “Hunter” unit carries a Pixhawk 4 flight controller and GPS, and broadcasts its position over a wireless link built from two Seeed XIAO ESP32 boards. The main airship runs a Cube Orange+ with our own custom built addition to ArduPilot ArduSub firmware that adds a new Follow mode. In Follow mode, the airship reads the Hunter’s position and drives its four thrusters to stay at a set offset from it: two side thrusters for sideways movement and turning, a forward pair, and a lift pair. It also holds a fixed height above its takeoff point. The pilot can switch between Manual and Follow at any time from the Herelink controller. With the airship held on the bench, we checked that the GPS locked, that the Hunter’s position reached the airship over the XIAO link, and that the thrusters responded correctly as the Hunter moved, all before any free flight.

Outdoor Blimp flying - First Flight

Our first outdoor test was mainly a full rehearsal of field operations, as much as a test of the airship itself. We transported the airship, gondola, ground station and support gear to the site. Then we worked through setting up and preparing the airship on location, and timed each step to find where our process could be tightened. The team ran the pre-flight checklist end to end, confirming it caught everything needed before launch, and refined it where steps were missing or out of order. In flight, we first flew the airship under manual control from the Herelink controller, getting a feel for how it handles and how much thrust it takes to hold position against the wind. We then switched to autonomous GPS-guided flight outdoors for the first time. After landing, we practised the post-flight procedures: securing the airship, shutting down and checking the systems, saving the flight logs and packing up. The lessons from this test are feeding directly into our procedures for upcoming flights and, operations in the Arctic (November 16, 2026)

Get in touch
Interested in ACCESS?

We’d love to connect with researchers, community partners, and collaborators.

Philip A. Ferguson, Ph.D, P.Eng, FCAE

Director, STARLab University of Manitoba

philip.ferguson@umanitoba.ca · umstarlab.ca